Data centers require dozens or even hundreds of engines and turbines to be permitted, commissioned and tested on aggressive timelines. Onterris combines air permitting, stack testing and ongoing emissions support through one coordinated team, helping owners, developers and operators bring data centers online quickly, maintain compliance and operate efficiently throughout their lifecycle.
Align testing and permitting
Align permit assumptions, test methods and monitoring obligations before they become commissioning constraints.
Protect startup timelines
Coordinate test methods, crews, equipment, load conditions and reporting across complex projects so emissions testing does not become a critical path delay.
Make faster commissioning decisions
Avoid the “test-wait-retest” loop by using onsite FTIR emissions data to verify equipment, tune controls and resolve performance issues during the same deployment.
Maintain compliance after go-live
Execute recurring source testing, CEMS/PEMS audits, permit reporting and control-system verification as one connected program rather than a series of disconnected projects.

Comprehensive emissions support for data centers

Rapid deployment of backup generators and on-site turbines creates a complex, site-wide compliance footprint and a need to coordinate permitting, commissioning, monitoring and reporting. Onterris connects planning and permitting through commissioning and recurring compliance testing so teams can protect go-live timelines and operate with confidence.

Confident emissions compliance, every step of the way

Every data center, while unique in its requirements, moves through a similar lifecycle. Onterris provides the national scale and technical expertise to manage the full testing lifecycle, ensuring your facilities remain compliant while optimizing site performance.

Phase 1: Planning and permitting

Define emissions assumptions, evaluate regulatory pathways, model impacts and establish testing and monitoring requirements.

Typical support:
  • Permit applications
  • BACT and LAER evaluation
  • Dispersion modeling
  • Source and fleet inventories
  • Testability review
  • Testing and protocol strategy

Phase 2: Commission and verify

Verify manufacturer guarantees, demonstrate initial compliance and use real-time data to tune equipment and controls.

Typical support:
  • Acceptance testing
  • Initial compliance testing
  • SCR optimization
  • Catalyst verification
  • FTIR measurement
  • Low-level PM testing

Phase 3: Certify and audit

Support CEMS and PEMS development, certification and recurring audits using independent reference measurements.

Typical support:
  • Temporary CEMS
  • PEMS model data
  • Performance specification tests
  • Relative accuracy test audits
  • Cylinder gas audits
  • QA documentation

Phase 4: Maintain compliance

Execute recurring testing, evaluate control-system performance and adapt the compliance program as conditions change.

Typical support:
  • Periodic source testing
  • Emission-factor updates
  • Regulatory reporting
  • Catalyst performance trending
  • Permit modifications
  • Community engagement

The most trusted team in data center emissions compliance

Dr. Shagun Bhat brings nearly 20 years of air quality consulting expertise to a variety of industries. A chemical engineer by trade, his areas of expertise include New Source Review (NSR) and Prevention of Significant Deterioration (PSD) permitting, air dispersion modeling, emissions inventory development, use of optical technologies for emission inventory improvement, and litigation support.
Blake has over a decade of experience in air quality management, engineering and regulatory testing, with a primary focus on power start-up and commissioning stack testing, as well as Fourier transform infrared (FTIR) technologies. He also brings a strong background in financial forecasting, client growth strategy and performance analysis to support business expansion and customer retention.
Greg Burch brings more than 30 years of industry experience to the Onterris team where he currently works as Regional Vice President of the Gulf Coast region with deep expertise in refining, power generation and data center projects. He is also a a Qualified Stack Test Individual (QSTI) Groups I, II, III and IV.

Talk to an expert about your data center emissions compliance

Build an emissions compliance program you can operate with confidence, with one partner coordinating air permitting, stack testing and ongoing regulatory support. Fill out this quick form to schedule time with an air quality expert.

Data center cooling units and two people collaborating inside a data center

Explore the latest air quality resources

How Regional Energy Hubs Are Reshaping US Data Center Infrastructure

Pennsylvania emerges as a model for energy-first data center development

Air Permitting for Data Centers: What Determines Your Timeline

How location, power generation and the regulatory landscape affect data center air permits

HON MACT Fenceline Monitoring Requirements

Understand HON MACT fenceline monitoring requirements, EPA Methods 325A/325B and 327, and how real-time monitoring supports faster emissions response.

Emissions Compliance Is a Strategic Lever for Data Centers

An integrated approach helps operators reduce risk, improve performance and strengthen sustainability outcomes

LNG Methane Emissions Measurement & Monitoring

Learn how direct methane measurement across LNG loading, shipping and unloading helps operators strengthen emissions data, compliance and market access.

A Smarter Approach to Methane Management in Wastewater Treatment Plants

With better visibility into emissions, operators can act on high-impact leaks, reduce odor and strengthen maintenance outcomes

PFAS in Air: New EPA Testing Methods Reshape Emissions Management

What methods like OTM-45 and OTM-50 mean for the future of PFAS in air regulation

Federal Methane Rules in 2026: What Oil and Gas Operators Need to Do Now

Operators that act on measurement, documentation and system readiness now will strengthen performance and stay ahead of compliance

Appendix K Certification: Why OGI Compliance Demands Expertise and Discipline

The technical standard that determines whether your methane emissions data withstands regulatory scrutiny